Kelso Conservation area Road Resurfacing and Drainage Improvement
Construction2023

Kelso Conservation area Road Resurfacing and Drainage Improvement

MiltonClient:

Project Overview

The project involved the detailed design, preparation of tender documents, and contract administration with extensive public and stakeholder consultation to reconstruct and improve sections of Kelso Road and connecting sideroads within the Kelso Conservation Area. The project spanned approximately 950 meters of roadways. The scope also included field investigations, topographic surveys, geotechnical investigations, and the location of underground utilities. We conducted condition assessments, drainage improvements, preliminary and detailed roadway designs, utility coordination, contract administration, site inspections, and project close-out.

Kelso Conservation area Road Resurfacing and Drainage Improvement detail